Industrial Decommissioning and Cleaning Q&E

Client: Civil & Environmental Consultants (CEC)
Project: Underground Storage Tank and Contaminated Soil Removal
Location
: Indiana, West Virginia, Mississippi and Arkansas
Contract Value
: $800,000


Copyright AST Environmental

Description: A.S.T. performed all work required to clean, purge, and remove seven 12,000 gallon underground storage tanks.  The project involved the excavation, transportation and disposal of 20,000 tons of contaminated soil, asphalt, and/or concrete.  A.S.T. also replaced 25,000 square feet of concrete.  The project took place at four separate locations in four different states.

Client: Wright Patterson Air Force Base
Project:
Oil/Water Separator and Basin Maintenance and Cleaning
Location
: Wright Patterson Air Force Base, Fairborn, Ohio
Contract Value
: $1,726,000


Description: A.S.T. performed all work necessary to initially evaluate, sample, characterize, empty, clean, and inspect fifty oil/water separators and two large settling basins.  All separator and basin contents were sampled and waste profiles developed. The profiles were used to determine the proper disposal options and arrange for disposal. The tasks for cleaning the two large basins consisted of pumping, filtering, and discharging 280,000 gallons of water.  Additionally the large basins required the excavation, solidification, and disposal of 265 tons of coal dust material.  A.S.T. has a five year contract with the Air Force for continued maintenance and cleaning of the oil/water separators and basins.

Client: Bermuda Land Development Co., Ltd.
Project:
Removal of Fuel Storage Tanks in Industrial Zone I
Location
: Former U.S. Naval Air Station, Bermuda
Contract Value
: $521,000


Copyright AST Environmental

Description: A.S.T. performed all work required to clean, purge, remove and demolish 15 fuels tanks with combined capacities totaling over 2.5 million gallons. There were two 880,000 gallon aboveground storage tanks, two 210,000 gallon underground storage tanks (UST) with eleven other UST's of various sizes. A.S.T. prepared the project Work Plan for submittal to the government and acquisition of permits. A.S.T. mobilized all equipment, materials, and personnel for this large off-shore project.

A.S.T. was also responsible for verification sampling, excavation and removal of  impacted soils, water treatment of impacted groundwater and decommissioning of PCB transformers. A.S.T. installed monitoring wells and analyzed over 150 soil, water, and oil samples. All project operations were professionally executed one month prior to the specified completion date.

The clients satisfaction with our work on the initial contract work resulted in A.S.T. being awarded a contract to decommission six additional 25,000 gallon UST's not in the original contract. We also completed these additional tank removals prior to the original contract completion date.